From the truck dock side, even more work has taken place on the windows. Only one of the double hung windows has the 9-light original in-place. This by the way is the manager’s office.
Looking from the rail dock side of the building most of the windows have been replaced with newer double hung, single pane windows. Some are still the original not having rotted out yet.
The final installment the H beams for the roof. These play a part in ensuring that the roof stays out where it is supposed to, stiffening the structure in the process, and will carry the bus bars for lighting later on in the build.